My Website ↘

www.fionasichi.co.uk

Mon, 21st May — 0 notes

Concept Model:

Model showing connection across city and world through the installations. 


Sun, 13th May — 0 notes
Millennium Bridge Plan

Millennium Bridge Plan

Sun, 13th May — 0 notes
Visual:
Millennium Bridge 

Visual:

Millennium Bridge 

Sun, 13th May — 0 notes
Visual: 
Greenwich Foot Tunnel

Visual: 

Greenwich Foot Tunnel

Sun, 13th May — 1 note

Diagram of Installations


Sun, 13th May — 0 notes

Example of Wall and Floor Installation Interfaces 


Sun, 13th May — 1 note
Concept Diagram:
Concept behind this interactive installations reconnecting the city.

Concept Diagram:

Concept behind this interactive installations reconnecting the city.

Sun, 13th May — 0 notes

Main site locations for two of the installations:

Greenwich Foot Tunnel

Millennium Bridge


Sun, 13th May — 0 notes
Site Map for Locations of interactive installations along the River Thames.

Site Map for Locations of interactive installations along the River Thames.

Sun, 13th May — 0 notes

Model Prep:

Thesis Concept Model Preparation 


Wed, 25th Apr — 0 notes

Model Prep:

Sochi Model Preparation


Wed, 25th Apr — 0 notes
The affects of model making…

The affects of model making…

Wed, 25th Apr — 1 note

b-f-i:

exactly what is needed…

Thu, 19th Apr — 24 notes

Sketchbook:

Concept Sketches for Millennium Bridge, London installations. 


Fri, 13th Apr — 5 notes